Namazgah, Turkey
General contractor assignment including turbine technology.
Project data
- Head: 27.1 metres.
- Flow rate: 2 x 3.5 m³ /s.
- Turbines: 2 x Kaplan spiral, each 839 kW.
- Control: S7-1500.
- Visualization: fe.screen-view.
General contractor assignment including turbine technology.