Hydropower projects

Saarkette and Eifel power plants, Germany

Control and automation: F.EE was responsible with a total of 12 hydropower plants for the part component replacement (TKE) of the entire electrical engineering and the lubrication and control units with the exception of the medium voltage control systems. The hydraulic turbine controllers and bearing oil devices were also replaced.

PROJECT DATA

Saar power plants:

  • 7 hydropower plants from 1.4 to 12 MW.
  • 12 machine sets.
  • Kaplan bulb turbines.

Eifel power plants:

  • 5 hydropower plants from 0.7 to 16 MW.
  • 7 machine sets.
  • Head of 100, 60, 40, 7 and 5 metres.

Control cabinet construction

All hydropower control cabinets are produced in our own production centre in Neunburg v. W.