Hydropower projects

Weserkette, Germany

Ongoing project

Langwedel, Dörverden, Drakenburg, Landesbergen, Schlüsselburg and Petershagen are the six Statkraft sites requiring comprehensive retrofit works. The F.EE hydro power division was brought on board to assist with the measures by the subsidiary of the Norwegian state group. The contracted works included the optimisation of the plant operation and a significant overall increase in the degree of automation at all six power stations.

The project, which is set to run until mid 2019, started with the Langwedel power station, with its four Kaplan turbines and an actual power output of 7.2 MW. F.EE has successfully modernised Statkraft sites in the past, including the plants at Werrawerk and Wahnhausen near Kassel in 2013.


Control cabinet construction

All hydropower control cabinets are produced in our own production centre in Neunburg v. W.

To control cabinet construction

Mitarbeiter Schaltschrankverdrahtung

Contact us

We will be pleased to advise you and answer your request!

Your contact

Markus Breitschaft, Power engineering sales