Höllenstein, Germany
Two power plants have already been automated for Kraftwerk am Höllensteinsee AG: Höllenstein and Pulling at Blaibacher See. As the general contractor, F.EE was responsible for the replacement of the hydraulic turbine controllers.
Project data
Höllenstein power plant:
- Head: 12.5 metres.
- Flow rate: 3 x 12.1 m³/s.
- Turbines: 3 x Francis shaft, each 1250 kVA.
- Control: 3 x S7-300.
Pulling power plant:
- Drop height: 7.0 metres.
- Flow rate: 2 x 12.0 m³/s.
- Turbines: 2 x Kaplan spiral 595 kW.
- Control: 2 x S7-300.